FIT AND PROPER PERSON TEST

The fit and proper Regulations were made on 23 September 2020 and came into force in two parts. The first part came into force on 1 July 2021 by which time local authorities were required to be ready to receive applications from site owners. The second part came into force on 1 October 2021 by which time all site owners were required to have submitted applications to be assessed.

Local authorities will be able to charge an application fee and an annual fee and to recover the costs they have incurred, or which will be incurred, in appointing a person to manage a site with the site owner’s consent. This is consistent with the approach to other licensing fees (i.e., site licence fee). The charges should be shared between all residents and should be added to the Pitch Fee Review The fit and proper Regulations were made on 23 September 2020 and came into force in two parts. The first part came into force on 1 July 2021 by which time local authorities were required to be ready to receive applications from site owners. The second part came into force on 1 October 2021 by which time all site owners were required to have submitted applications to be assessed.

Local authorities will be able to charge an application fee and an annual fee and to recover the costs they have incurred, or which will be incurred, in appointing a person to manage a site with the site owner’s consent. This is consistent with the approach to other licensing fees (i.e. site licence fee). The charges should be shared between all residents and should be added to the Pitch Fee Review under Section 4C of the PFR form – ‘Recoverable Costs’.

https://www.legislation.gov.uk/uksi/2020/1034/data.pdf

https://www.gov.uk/government/publications/mobile-homes-fit-and-proper-person-test-guidance-for-local-authorities/mobile-homes-a-guide-for-local-authorities-on-the-fit-and-proper-person-test